California's NEM 3.0 (Net Billing Tariff) has changed the solar equation, but solar is still one of the best investments a Murrieta or Temecula homeowner can make -- especially when paired with battery storage. With over 280 sunny days per year in the Inland Empire, your roof is a power plant waiting to be activated.
Power Man Electric provides complete residential solar installation, from system design and electrical panel upgrades to permitting, utility interconnection, and battery storage integration. As a licensed C-10 electrical contractor with over 10 years of experience, we handle the electrical work that many solar-only companies subcontract out.
Custom system sizing based on your electricity usage, roof orientation, shading analysis, and NEM 3.0 optimization. We design systems that maximize your savings, not just panel count.
Tesla Powerwall, Enphase IQ Battery, and other leading storage systems. Store solar energy for peak-hour use and backup power during outages -- essential under NEM 3.0.
Most solar installations require dedicated breaker space. We upgrade panels from 100A to 200A and install solar disconnect switches and rapid shutdown systems as required by code.
String inverters, microinverters (Enphase), and power optimizers (SolarEdge). We select the right technology for your roof layout and shading conditions.
We handle all building permits, electrical permits, and the SCE (Southern California Edison) interconnection application. Many cities now process solar permits in minutes through SolarAPP+.
We configure your monitoring app so you can track solar production, battery charge, home consumption, and grid usage in real time from your phone.
Costs based on current California market data. The 30% federal Inflation Reduction Act tax credit applies to all system components including batteries.
| System Type | Before Tax Credit | After 30% Credit |
|---|---|---|
| Small System (5 kW) | $12,000 - $16,250 | $8,400 - $11,375 |
| Average System (7-9 kW) | $16,700 - $29,250 | $11,700 - $20,475 |
| Large System (10-12 kW) | $24,000 - $39,000 | $16,800 - $27,300 |
| Battery Storage (per unit) | $10,000 - $15,000 | $7,000 - $10,500 |
| Solar + Battery Bundle | $25,000 - $45,000 | $17,500 - $31,500 |
| Panel Upgrade (if needed) | $1,300 - $5,000 | Not covered by solar credit |
We analyze your electricity bills, assess your roof orientation and shading, inspect your electrical panel, and design a system optimized for your usage patterns and NEM 3.0 rates. No cost, no obligation.
You receive a detailed proposal with system size, panel layout, production estimates, savings projections, battery recommendations, and total cost including the 30% tax credit. Everything transparent and itemized.
We file building and electrical permits (often processed same-day through SolarAPP+), order your panels, inverters, and battery, and schedule the installation. Typical lead time is 2-3 weeks.
Our crew installs racking, panels, inverters, battery, and all electrical connections. We upgrade your panel if needed, install rapid shutdown devices, and wire everything to code. Most residential systems take 1-3 days.
City inspection, utility interconnection approval (SCE), and system activation. We configure your monitoring app and walk you through your new system. The entire process from contract to power-on takes 4-8 weeks.
Unlike solar-only companies, we are licensed C-10 electrical contractors. We do the panel upgrades, wiring, and electrical connections ourselves -- no subcontractors, no coordination headaches.
We design systems specifically for NEM 3.0 economics, prioritizing self-consumption and battery storage to maximize your savings under the new rate structure.
We install and configure Tesla Powerwall, Enphase IQ Battery, and other leading storage systems. Battery integration is no longer optional under NEM 3.0 -- it is essential.
We are electricians, not solar salespeople. We give you honest numbers, realistic payback timelines, and let the math speak for itself. No high-pressure tactics.
Combine solar with an EV charger installation or panel upgrade and save. One contractor, one permit, one project -- simpler and more affordable than hiring separate companies.
Based in Murrieta, CA 92562. 32 five-star reviews. 100% satisfaction guarantee. We are your neighbor, not a national chain that disappears after the sale.
"We got quotes from three solar companies, and Power Man Electric was the only one that actually explained NEM 3.0 and why we needed a battery. The other companies just wanted to sell us the biggest panel system possible. Our system has been running for 6 months now, and our electric bill went from $280/month to under $30. The battery keeps our house running during PSPS outages too."
-- Robert & Angela P., Temecula, CA
The average cost is $2.39 to $3.25 per watt installed. For a typical 7-9 kW system, that is $16,700 to $29,250 before the 30% federal tax credit. After the credit, you pay approximately $11,700 to $20,475. Adding battery storage (recommended under NEM 3.0) brings the total to $25,000 to $45,000 before incentives.
Yes, especially with battery storage. Under NEM 3.0, export compensation is approximately 75% less than retail rates, so a solar-only system takes longer to pay back. However, a solar-plus-battery system lets you store excess energy for peak-hour self-consumption, achieving a typical 6-9 year payback period plus backup power during outages.
Many homes with 100-amp panels need an upgrade to 200 amps before solar installation. Solar systems require dedicated breaker space and sufficient panel capacity. We assess your panel during our free consultation and include any necessary upgrades in your quote. Bundling saves money compared to separate projects.
California requires a building permit and an electrical permit. Many cities now use SolarAPP+ for real-time automated permitting. You also need utility interconnection approval from SCE before activation. We handle all permits, applications, and inspections as part of our service.
Physical installation takes 1-3 days. The complete process from contract to activated system takes 4-8 weeks, including permit approval, equipment procurement, installation, city inspection, and utility interconnection. We keep you informed at every step.
We install solar panel systems throughout Southwest Riverside County and the Inland Empire.